ECA Group is joining forces with iXblue and becomes Exail Learn moreIn the frame of its contract with Airbus signed beginning 2015 , the ECA GroupAerospace Division signed an over €10 million contract to supply a new assembly line for A320 front sections in Saint-Nazaire Airbus plant. The two first stations of the SALSA project (Ramp up A320) were delivered at ST NAZAIRE plant with 1 and 2 weeks in advance. It’s the result of six months’ work and coordination between Airbus teams (project and production), ECA Group and suppliers to define and integrate these “Customer inspection” in the A320 workshop without disturbing the production. This challenge is not over. Eight others stations must be commissioned in the 2 next years in the same workshop.


Meet ECA Group at WATS (World Aviation Training Symposium) held in Orlando, USA, from April 30th...
Read More
10 Sep. 2019ECA Group announces today at APEX EXPO 2019 the release of its new onboard connectivity turnkey...
Read More
Meet ECA Group at APEX EXPO, in Los Angeles on September 9-12th 2019, to discover its wide range...
Read More
15 Jul. 2019ECA GROUP is proud to have been awarded the Airbus Helicopters Supplier Awards in Le Bourget...
Read MoreECA GROUP is awarded by THALES ALENIA SPACE to supply High Performance Frequency Transpositions...
Read More
19 Jun. 2019ECA Group was entrusted by a major aircraft manufacturer with the project of designing,...
Read More
Meet ECA GROUP at 2019 AEEC / AMC & MMC conferences in Prague, Czech Republic. At this event,...
Read More
27 Mar. 2019ECA Group was selected by a Completion Center in the Middle East to provide Wi-Fi for their B767...
Read More
Meet ECA Group at APEX ASIA, in Shanghai on 12 - 13 March 2019, to discover its wide range of...
Read More
30 Jan. 2019Specialising in stratospheric balloon activities, ECA Group worked together with the University...
Read More